Commercial Carpentry Guide

What to include in a commercial carpentry tender package

Published · By Formed Carpentry

Before inviting carpentry quotes, give every contractor the same picture of the work. Current drawings matter, but so do the items between the drawings: who supplies the hardware, when each area is available and what the price is expected to include.

1. Issue one drawing set with a revision register

List the drawings, specifications and schedules that form the pricing set, with a revision number and issue date for each. Include the architectural plans, relevant details and any structural information needed for the carpentry scope. A folder containing several versions of the same plan leaves the estimator to decide which one applies.

Mark superseded files and identify documents still to come. If a detail changes during tender, send the same addendum to every tenderer and ask each to acknowledge it in their return. Set a deadline for questions and a person who will answer them, so a clarification reaches everyone pricing the work.

  • Include plans, elevations, sections and enlarged details referenced by the scope.
  • Check that door, hardware, finish and joinery schedules refer to the same drawing issue.
  • Identify unresolved design items and ask for a stated allowance or exclusion rather than an unstated assumption.

2. Define the work by location and package boundary

Name the building, level, tenancy or stage covered by each scope item. Replace broad wording such as 'all carpentry' with a list of the work to be priced. Separate framing, doors and hardware, cladding, joinery installation and finishing where they will be let as different packages.

State where the carpentry work meets another trade. For a partition, identify who supplies and installs the framing, linings, insulation and trims. For a refurbishment, mark retained elements, new work and any removal required. These boundaries belong in the written scope even when a drawing shows the finished result.

  • Identify included work, excluded work and work by others against each package.
  • Reference the drawing or specification for materials, fixing details and finishes.
  • State who is responsible for set-out, protection, waste removal and making good where those tasks affect the package.

3. Make quantities and door schedules traceable

If you issue quantities, say whether they are indicative or the basis of the tender, and whether the tenderer must check them. Keep the measurement basis consistent: a count of doors, a length of skirting and an area of cladding describe different work. Note the levels and zones included so quantities can be checked against the plans.

Door pricing needs more than a total count. Use door identifiers that match the plans and connect each one to its frame, leaf, hardware set and finish. Include the specified rating where relevant and flag missing information for clarification. Separate door installation from work allocated to other contractors and state those boundaries explicitly.

  • For door sets: identify dimensions, handing, frame or jamb type, leaf type and hardware reference.
  • For partitions and cladding: provide heights, material specifications, details at openings and relevant junctions.
  • For trims and joinery: identify profiles, finish requirements, installation details and the rooms or areas covered.

4. Name the material supplier and the receiving party

Write down who supplies each major item and who installs it. 'Builder supplied' still leaves questions about delivery, unloading, storage and moving materials to the workface. Resolve those responsibilities for doors, frames, hardware, joinery and any other items outside the carpenter's supply scope.

Include expected delivery dates and any procurement decisions still open. If hardware or joinery is supplied by someone else, state who checks the schedule, confirms dimensions and handles missing or damaged items. Ask tenderers to identify supply assumptions in their quote so they can be compared before award.

  • Assign supply, delivery, unloading, storage and installation separately where needed.
  • Confirm who provides access equipment, lifting arrangements and any shared site facilities.
  • Identify which party supplies fixings, consumables and protection for completed work.

5. Price the programme and the site conditions together

Give tenderers the intended start, stage dates and handover sequence, plus the date you need their quote. Explain whether the work is one continuous run or several visits. A door package installed floor by floor has different access and coordination needs from one released in a single stage.

For occupied offices, retail tenancies or other live spaces, include the working hours, noisy-work windows and areas that remain in use. Show where materials enter, how they reach each work area and what storage is available. State any induction or booking requirements that affect when a crew can begin work.

  • Identify dependencies, such as an area being ready for framing or door installation.
  • Show access restrictions, delivery windows, staging and any after-hours requirements.
  • Ask the tenderer to state the programme and number of visits allowed for in the price.

6. Ask every tenderer for the same return format

A single total makes it hard to see whether two contractors priced the same work. Request a breakdown by the packages or stages you intend to award. Ask for the drawing revisions used, inclusions, exclusions, allowances, programme assumptions, quote validity and GST treatment in the same place in each return.

Keep a clarification register as quotes arrive. Record the question, the contractor's answer and any agreed price change. If a response changes the scope for everyone, issue it to all tenderers rather than comparing one revised package with several original ones.

  • Separate firm scope from allowances for details that are not yet resolved.
  • Request any proposed alternatives as separate options with the original scope still identifiable.
  • Confirm the agreed scope and exclusions in the award documents rather than relying on an email trail alone.

Compare the scope before the total

Set up a comparison with one row per scope item and one column per tenderer. Mark each item included, excluded, allowed for or unclear. Add the confirmed supply and site responsibilities before deciding whether a price difference comes from the rate, the quantity or a gap in the scope.

Example checks for a doors and hardware package
Quote differenceClarify before comparing
One quote includes hardware installation only.Does the other include hardware supply? Confirm both against the same schedule.
One quote allows a single site visit.Does the programme require separate visits for frames, leaves and final hardware?
The quotes use different door counts.Reconcile door identifiers and drawing revisions, including common areas and staged work.

This example is a way to compare returns. The scope and responsibilities for your project still need to be agreed with the contractor.

Putting the package to Formed

Formed scopes and delivers commercial carpentry packages for builders and head contractors across the Gold Coast and Brisbane. For interior work, see the supported fit-out carpentry scope before preparing your invitation.

If your site team will direct the work and needs additional carpenters rather than a priced package, read the labour hire and subcontracting guide first.